Volkswagen will switch to the Group Reference CATIA (GRC) 9.2.5.3. With the GRC 9.2.5.3, the VWGRCLite 9.2.5.3.0 is also released for use by the engineering partner.
The Volkswagen internal use of the GRC 9.2.5.3 begins on Monday, May 16, 2022.
The productive use of the VWGRCLite 9.2.5.3.0 at the partner companies must take place at the same time as the GRC goes live at Volkswagen.
There will be no transition period for the use of the VWGRCLite at the partner companies!
Contact our ServiceDesk